{"id":13058,"date":"2026-01-12T23:52:06","date_gmt":"2026-01-12T23:52:06","guid":{"rendered":"https:\/\/www.ahearn.com\/?p=13058"},"modified":"2026-01-12T23:52:28","modified_gmt":"2026-01-12T23:52:28","slug":"from-12-hours-of-weekly-downtime-to-near-zero-a-food-manufacturers-story","status":"publish","type":"post","link":"https:\/\/www.ahearn.com\/fr\/from-12-hours-of-weekly-downtime-to-near-zero-a-food-manufacturers-story\/","title":{"rendered":"From 12 Hours of Weekly Downtime to Near-Zero: A Food Manufacturer&#8217;s Story"},"content":{"rendered":"<p><strong>How ProVision Label and ProVision Automation by Ahearn &amp; Soper Inc. Transformed Production Efficiency<\/strong><\/p>\r\n\r\n\r\n\r\n<h2 class=\"wp-block-heading\"><strong>The Challenge: A Production Line Brought to Its Knees<\/strong><\/h2>\r\n\r\n\r\n\r\n<p>For a mid-sized food manufacturing facility in the Northeast producing fresh salads and prepared foods, their labeling operations had become a critical bottleneck. What should have been a seamless final step before shipping had turned into a daily struggle that was costing them thousands of dollars and threatening customer relationships.<\/p>\r\n\r\n\r\n\r\n<p>The numbers told a stark story: <strong>12 hours of downtime every single week<\/strong>. That&#8217;s nearly two full production days lost each month to labeling failures, misfeeds, and system errors.<\/p>\r\n\r\n\r\n\r\n<p>&#8220;We were constantly firefighting,&#8221; recalls the plant&#8217;s Operations Manager. &#8220;Monday morning would start with optimism, but by Tuesday afternoon, we&#8217;d be scrambling to meet orders because the labeler was down again. It became our new normal, and that was the problem.&#8221;<\/p>\r\n\r\n\r\n\r\n<p>The facility operated three high-speed packaging lines, each requiring precise date coding and nutritional labeling to meet FDA\/CFIA requirements. Their existing labeling system, cobbled together from multiple vendors over the years, simply couldn&#8217;t keep pace with modern production demands.<\/p>\r\n\r\n\r\n\r\n<h2 class=\"wp-block-heading\"><strong>The Breaking Point<\/strong><\/h2>\r\n\r\n\r\n\r\n<p>The situation reached a crisis point during their busiest season. A major retailer had increased their order volume by 40%, representing a significant growth opportunity. Instead of celebration, the production team faced panic. Their labeling system couldn&#8217;t handle the increased throughput, leading to:<\/p>\r\n\r\n\r\n\r\n<ul class=\"wp-block-list\">\r\n<li>\u00b7 <strong>Frequent misfeeds<\/strong> requiring manual intervention and line stops<\/li>\r\n\r\n\r\n\r\n<li>\u00b7 <strong>Label misalignment<\/strong> causing product rejections and rework<\/li>\r\n\r\n\r\n\r\n<li>\u00b7 <strong>Inconsistent print quality<\/strong> triggering compliance concerns<\/li>\r\n\r\n\r\n\r\n<li>\u00b7 <strong>System crashes<\/strong> requiring complete restarts and recalibration<\/li>\r\n\r\n\r\n\r\n<li>\u00b7 <strong>Maintenance calls<\/strong> becoming a daily occurrence rather than occasional events<\/li>\r\n<\/ul>\r\n\r\n\r\n\r\n<p>The financial impact was devastating. Beyond the direct costs of downtime, they faced overtime expenses, rushed shipping fees to make up for delays, and the looming threat of losing their largest customer if reliability didn&#8217;t improve.<\/p>\r\n\r\n\r\n\r\n<h2 class=\"wp-block-heading\"><strong>Enter Ahearn &amp; Soper Inc.: A Partnership Built on Understanding&nbsp;<\/strong><\/h2>\r\n\r\n\r\n\r\n<p>When the facility reached out to Ahearn &amp; Soper Inc., they weren&#8217;t just looking for new equipment. They needed a partner who understood the unique challenges of food manufacturing and could provide a comprehensive solution, not just a product.<\/p>\r\n\r\n\r\n\r\n<p>The Ahearn &amp; Soper team spent two full days on-site, observing operations during actual production runs, interviewing line operators, and analyzing failure data. This wasn&#8217;t a sales pitch; it was a diagnostic process.<\/p>\r\n\r\n\r\n\r\n<p>&#8220;What impressed us immediately was that they didn&#8217;t come in with a pre-packaged solution,&#8221; the Operations Manager noted. &#8220;They watched, they listened, and they asked questions we hadn&#8217;t even thought to ask ourselves.&#8221;<\/p>\r\n\r\n\r\n\r\n<h2 class=\"wp-block-heading\"><strong>The Discovery Process<\/strong><\/h2>\r\n\r\n\r\n\r\n<p>The assessment revealed several critical issues beyond just aging equipment:<\/p>\r\n\r\n\r\n\r\n<p><strong>Integration Gaps<\/strong>: The existing system used components from four different manufacturers, creating communication bottlenecks and making troubleshooting a nightmare.<\/p>\r\n\r\n\r\n\r\n<p><strong>Operator Challenges<\/strong>: Label changeovers required extensive manual adjustment, taking up to 45 minutes per SKU switch and introducing human error.<\/p>\r\n\r\n\r\n\r\n<p><strong>Data Disconnection<\/strong>: The labeling system operated independently from the facility&#8217;s production management software, preventing real-time monitoring and predictive maintenance.<\/p>\r\n\r\n\r\n\r\n<p><strong>Scalability Limitations<\/strong>: Even if the current system worked perfectly, it lacked the capacity to handle anticipated growth.<\/p>\r\n\r\n\r\n\r\n<h2 class=\"wp-block-heading\"><strong>The Solution: ProVision Label and ProVision Automation<\/strong><\/h2>\r\n\r\n\r\n\r\n<p>Based on their findings, Ahearn &amp; Soper recommended an integrated solution combining <strong>ProVision Label<\/strong> print-and-apply systems with <strong>ProVision Automation<\/strong> controls across all three production lines.<\/p>\r\n\r\n\r\n\r\n<h2 class=\"wp-block-heading\"><strong>Why This Solution Made Sense<\/strong><\/h2>\r\n\r\n\r\n\r\n<p><strong>ProVision Label<\/strong> offered industrial-grade reliability specifically engineered for the demanding food manufacturing environment. The system featured:<\/p>\r\n\r\n\r\n\r\n<ul class=\"wp-block-list\">\r\n<li>\u00b7 High-speed thermal transfer printing with consistent quality at up to 12 inches per second<\/li>\r\n\r\n\r\n\r\n<li>\u00b7 Automatic label detection and calibration<\/li>\r\n\r\n\r\n\r\n<li>\u00b7 Tool-free label roll changes reducing changeover time by 70%<\/li>\r\n\r\n\r\n\r\n<li>\u00b7 Sealed enclosures protecting against moisture and contamination<\/li>\r\n\r\n\r\n\r\n<li>\u00b7 Flexible applicator heads accommodating various package sizes and shapes<\/li>\r\n<\/ul>\r\n\r\n\r\n\r\n<p><strong>ProVision Automation<\/strong> provided the intelligent control layer that transformed individual pieces of equipment into a cohesive system:<\/p>\r\n\r\n\r\n\r\n<ul class=\"wp-block-list\">\r\n<li>\u00b7 Seamless integration with existing PLC systems<\/li>\r\n\r\n\r\n\r\n<li>\u00b7 Real-time monitoring and diagnostics<\/li>\r\n\r\n\r\n\r\n<li>\u00b7 Predictive maintenance alerts<\/li>\r\n\r\n\r\n\r\n<li>\u00b7 Centralized SKU management with one-touch changeovers<\/li>\r\n\r\n\r\n\r\n<li>\u00b7 Production data analytics and reporting<\/li>\r\n<\/ul>\r\n\r\n\r\n\r\n<h2 class=\"wp-block-heading\"><strong>Implementation: Minimizing Disruption<\/strong><\/h2>\r\n\r\n\r\n\r\n<p>Ahearn &amp; Soper understood that downtime during installation could be as costly as the problem they were solving. The implementation strategy was designed around the facility&#8217;s production schedule:<\/p>\r\n\r\n\r\n\r\n<p><strong>Phase 1 &#8211; Preparation (Weeks 1-2)<\/strong>: Pre-configuration of all equipment off-site, operator training using simulation, and detailed installation planning to minimize production impact.<\/p>\r\n\r\n\r\n\r\n<p><strong>Phase 2 &#8211; Installation (Weeks 3-4)<\/strong>: Line-by-line installation during scheduled maintenance windows, with the old system remaining operational as backup until full validation of the new equipment.<\/p>\r\n\r\n\r\n\r\n<p><strong>Phase 3 &#8211; Optimization (Weeks 5-6)<\/strong>: Fine-tuning based on actual production conditions, operator feedback sessions, and development of custom protocols for specific product lines.<\/p>\r\n\r\n\r\n\r\n<p>Throughout the process, an Ahearn &amp; Soper technician remained on-site, available for immediate support and adjustments.<\/p>\r\n\r\n\r\n\r\n<h2 class=\"wp-block-heading\"><strong>The Results: Beyond Expectations<\/strong><\/h2>\r\n\r\n\r\n\r\n<p>The transformation was immediate and dramatic. Within the first week of full operation, downtime dropped by 85%. By week four, the facility was experiencing something they hadn&#8217;t seen in years: <strong>near-zero unplanned downtime<\/strong>.<\/p>\r\n\r\n\r\n\r\n<p><strong>By the Numbers<\/strong><\/p>\r\n\r\n\r\n\r\n<p><strong>Downtime Reduction<\/strong><\/p>\r\n\r\n\r\n\r\n<ul class=\"wp-block-list\">\r\n<li>\u00b7 From: 12 hours per week<\/li>\r\n\r\n\r\n\r\n<li>\u00b7 To: Less than 30 minutes per week<\/li>\r\n\r\n\r\n\r\n<li>\u00b7 Improvement: 96% reduction<\/li>\r\n<\/ul>\r\n\r\n\r\n\r\n<p><strong>Changeover Efficiency<\/strong><\/p>\r\n\r\n\r\n\r\n<ul class=\"wp-block-list\">\r\n<li>\u00b7 From: 45 minutes per SKU change<\/li>\r\n\r\n\r\n\r\n<li>\u00b7 To: 6 minutes per SKU change<\/li>\r\n\r\n\r\n\r\n<li>\u00b7 Improvement: 87% faster<\/li>\r\n<\/ul>\r\n\r\n\r\n\r\n<p><strong>Production Throughput<\/strong><\/p>\r\n\r\n\r\n\r\n<ul class=\"wp-block-list\">\r\n<li>\u00b7 Increase: 28% without adding labor<\/li>\r\n\r\n\r\n\r\n<li>\u00b7 Contributing factors: Faster changeovers, eliminated rework, consistent uptime<\/li>\r\n<\/ul>\r\n\r\n\r\n\r\n<p><strong>Maintenance Costs<\/strong><\/p>\r\n\r\n\r\n\r\n<ul class=\"wp-block-list\">\r\n<li>\u00b7 Reduction: 62% in emergency service calls<\/li>\r\n\r\n\r\n\r\n<li>\u00b7 Contributing factors: Predictive maintenance, improved reliability<\/li>\r\n<\/ul>\r\n\r\n\r\n\r\n<p><strong>Quality Metrics<\/strong><\/p>\r\n\r\n\r\n\r\n<ul class=\"wp-block-list\">\r\n<li>\u00b7 Label application accuracy: 99.97%<\/li>\r\n\r\n\r\n\r\n<li>\u00b7 Print quality consistency: 99.9%<\/li>\r\n\r\n\r\n\r\n<li>\u00b7 Compliance audit performance: Zero deficiencies<\/li>\r\n<\/ul>\r\n\r\n\r\n\r\n<h2 class=\"wp-block-heading\"><strong>The Intangible Benefits<\/strong><\/h2>\r\n\r\n\r\n\r\n<p>Beyond the measurable metrics, the facility experienced cultural transformation:<\/p>\r\n\r\n\r\n\r\n<p><strong>Operator Confidence<\/strong>: Line operators, previously stressed by constant troubleshooting, now approached their work with confidence. The intuitive touchscreen interface and predictive alerts made them feel empowered rather than reactive.<\/p>\r\n\r\n\r\n\r\n<p><strong>Customer Satisfaction<\/strong>: With reliable on-time delivery restored, the facility not only retained their major retailer but secured additional contracts based on their improved performance.<\/p>\r\n\r\n\r\n\r\n<p><strong>Growth Capacity<\/strong>: The scalable system positioned the facility to pursue new opportunities without fear that their labeling operations would become a bottleneck again.<\/p>\r\n\r\n\r\n\r\n<p><strong>Sustainability Impact<\/strong>: Reduced label waste from misfeeds and misprints translated to lower material costs and environmental impact, aligning with the company&#8217;s sustainability goals.<\/p>\r\n\r\n\r\n\r\n<h2 class=\"wp-block-heading\"><strong>The Six-Month Follow-Up: Sustained Excellence<\/strong><\/h2>\r\n\r\n\r\n\r\n<p>Six months after implementation, Ahearn &amp; Soper conducted a comprehensive performance review. The results validated the investment and revealed continuing benefits:<\/p>\r\n\r\n\r\n\r\n<p><strong>Maintained Performance<\/strong>: The near-zero downtime wasn&#8217;t a honeymoon period; it was the new baseline. The system had processed over 2.3 million labeled units with a 99.96% success rate.<\/p>\r\n\r\n\r\n\r\n<p><strong>Expanded Capabilities<\/strong>: With the labeling system reliable, the facility had introduced five new SKUs that would have been impossible with the old equipment.<\/p>\r\n\r\n\r\n\r\n<p><strong>Data-Driven Decisions<\/strong>: The analytics provided by ProVision Automation enabled the facility to identify and optimize other bottlenecks in their production process, creating a continuous improvement culture.<\/p>\r\n\r\n\r\n\r\n<p><strong>Return on Investment<\/strong>: The initial investment in the ProVision system achieved payback in just 11 months through downtime reduction, labor savings, and increased throughput.<\/p>\r\n\r\n\r\n\r\n<h2 class=\"wp-block-heading\"><strong>Key Takeaways: Lessons for Food Manufacturers<\/strong><\/h2>\r\n\r\n\r\n\r\n<p>This transformation offers several important lessons for food manufacturers facing similar challenges:<\/p>\r\n\r\n\r\n\r\n<p><strong>1. Integration Matters More Than Individual Components<\/strong><\/p>\r\n\r\n\r\n\r\n<p>The most sophisticated labeler won&#8217;t deliver results if it doesn&#8217;t communicate effectively with your other systems. ProVision&#8217;s integrated approach eliminated the finger-pointing that occurs when multiple vendors&#8217; equipment fails to work together.<\/p>\r\n\r\n\r\n\r\n<p><strong>2. Operator Experience Drives Adoption<\/strong><\/p>\r\n\r\n\r\n\r\n<p>Technology only delivers value if people use it correctly. The ProVision system&#8217;s intuitive interface and one-touch changeover process meant operators embraced rather than resisted the new equipment.<\/p>\r\n\r\n\r\n\r\n<p><strong>3. Data Enables Continuous Improvement<\/strong><\/p>\r\n\r\n\r\n\r\n<p>Real-time monitoring and predictive maintenance transformed maintenance from reactive to proactive, preventing problems before they caused downtime.<\/p>\r\n\r\n\r\n\r\n<p><strong>4. Partnership Extends Beyond Installation<\/strong><\/p>\r\n\r\n\r\n\r\n<p>Ahearn &amp; Soper&#8217;s ongoing support, including quarterly optimization visits and 24\/7 technical support, ensured sustained performance and continuous improvement.<\/p>\r\n\r\n\r\n\r\n<p><strong>5. Scalability Protects Future Investment<\/strong><\/p>\r\n\r\n\r\n\r\n<p>Designing for growth from the beginning meant the system could accommodate expansion without requiring replacement or major modification.<\/p>\r\n\r\n\r\n\r\n<h2 class=\"wp-block-heading\"><strong>The Competitive Advantage<\/strong><\/h2>\r\n\r\n\r\n\r\n<p>In today&#8217;s food manufacturing environment, reliability isn&#8217;t just about avoiding costs, it&#8217;s about creating competitive advantages. This facility&#8217;s transformation illustrates how the right labeling solution impacts every aspect of operations:<\/p>\r\n\r\n\r\n\r\n<p><strong>Speed to Market<\/strong>: Faster changeovers enable smaller production runs and more frequent product rotations, responding quickly to market trends and seasonal demands.<\/p>\r\n\r\n\r\n\r\n<p><strong>Quality Assurance<\/strong>: Consistent labeling accuracy eliminates compliance risks and supports brand reputation in an era where a single recall can devastate consumer trust.<\/p>\r\n\r\n\r\n\r\n<p><strong>Operational Flexibility<\/strong>: The ability to confidently commit to new contracts and customers, knowing that production capacity is reliable and scalable.<\/p>\r\n\r\n\r\n\r\n<p><strong>Employee Retention<\/strong>: Reducing frustration and firefighting creates a better work environment, helping retain skilled operators in a tight labor market.<\/p>\r\n\r\n\r\n\r\n<h2 class=\"wp-block-heading\"><strong>Looking Forward: A Foundation for Growth<\/strong><\/h2>\r\n\r\n\r\n\r\n<p>Today, the facility is exploring opportunities that would have been impossible two years ago. They&#8217;re in discussions with national retailers, developing co-packing relationships, and planning expansion into new product categories.<\/p>\r\n\r\n\r\n\r\n<p>&#8220;The ProVision system didn&#8217;t just solve our downtime problem,&#8221; reflects the Operations Manager. &#8220;It changed our entire outlook. We went from managing crises to planning growth. That&#8217;s transformational.&#8221;<\/p>\r\n\r\n\r\n\r\n<p>The facility&#8217;s production team now views their labeling operation as a competitive strength rather than a vulnerability. When competitors struggle with reliability issues, they&#8217;re confidently pursuing market opportunities.<\/p>\r\n\r\n\r\n\r\n<h2 class=\"wp-block-heading\"><strong>Why Ahearn &amp; Soper Inc.?<\/strong><\/h2>\r\n\r\n\r\n\r\n<p>This success story illustrates what differentiates Ahearn &amp; Soper Inc. in the industrial automation marketplace:<\/p>\r\n\r\n\r\n\r\n<p><strong>Industry Expertise<\/strong>: Deep understanding of food manufacturing requirements, regulations, and operational realities.<\/p>\r\n\r\n\r\n\r\n<p><strong>Comprehensive Solutions<\/strong>: Integration of labeling, automation, and controls into cohesive systems rather than disconnected components.<\/p>\r\n\r\n\r\n\r\n<p><strong>Implementation Excellence<\/strong>: Proven methodologies that minimize disruption and accelerate time to value.<\/p>\r\n\r\n\r\n\r\n<p><strong>Ongoing Partnership<\/strong>: Commitment to customer success that extends far beyond initial installation.<\/p>\r\n\r\n\r\n\r\n<p><strong>Innovation Focus<\/strong>: Continuous product development informed by real-world customer feedback and emerging industry needs.<\/p>\r\n\r\n\r\n\r\n<h2 class=\"wp-block-heading\"><strong>Is Your Facility Facing Similar Challenges?<\/strong><\/h2>\r\n\r\n\r\n\r\n<p>If you recognize elements of this story in your own operations, whether it&#8217;s excessive downtime, inefficient changeovers, compliance concerns, or inability to scale, the solution may be closer than you think.<\/p>\r\n\r\n\r\n\r\n<p>Ahearn &amp; Soper Inc. offers complimentary production assessments to help food manufacturers identify optimization opportunities. Their team of experts can evaluate your current labeling operations and provide actionable recommendations, whether that involves ProVision solutions or other approaches tailored to your specific needs.<\/p>\r\n\r\n\r\n\r\n<p><strong>The question isn&#8217;t whether you can afford to upgrade your labeling operations. It&#8217;s whether you can afford not to.<\/strong><\/p>\r\n\r\n\r\n\r\n<h2 class=\"wp-block-heading\"><strong>About ProVision Label and ProVision Automation<\/strong><\/h2>\r\n\r\n\r\n\r\n<p><strong>ProVision Label<\/strong> systems deliver industrial-grade print-and-apply labeling solutions designed specifically for demanding food manufacturing environments. With flexible configurations, reliable performance, and ease of use, ProVision Label adapts to your production requirements while maintaining consistent quality.<\/p>\r\n\r\n\r\n\r\n<p><strong>ProVision Automation<\/strong> provides intelligent control and integration capabilities that transform individual equipment into optimized production systems. Real-time monitoring, predictive maintenance, and seamless WMS integration deliver visibility and control that drive continuous improvement.<\/p>\r\n\r\n\r\n\r\n<h2 class=\"wp-block-heading\"><strong>About Ahearn &amp; Soper Inc.<\/strong><\/h2>\r\n\r\n\r\n\r\n<p>For over three decades, Ahearn &amp; Soper Inc. has been a trusted partner to food manufacturers throughout North America, providing innovative automation solutions that solve real-world production challenges. Their comprehensive approach combines industry-leading products, expert implementation, and ongoing support to deliver sustained operational excellence.<strong>Ready to transform your labeling operations?<\/strong> Contact Ahearn &amp; Soper Inc. today to schedule your complimentary production assessment and discover how ProVision solutions can eliminate downtime, increase throughput, and position your facility for growth.<\/p>\r\n\r\n\r\n\r\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>How ProVision Label and ProVision Automation by Ahearn &amp; Soper Inc. Transformed Production Efficiency The Challenge: A Production Line Brought to Its Knees For a mid-sized food manufacturing facility in&#8230;<\/p>","protected":false},"author":5,"featured_media":13060,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[226],"tags":[],"class_list":{"0":"post-13058","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-labeling"},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\r\n<title>From 12 Hours of Weekly Downtime to Near-Zero: A Food Manufacturer&#039;s Story - Ahearn &amp; Soper | proVision WMS<\/title>\r\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\r\n<link rel=\"canonical\" href=\"https:\/\/www.ahearn.com\/fr\/from-12-hours-of-weekly-downtime-to-near-zero-a-food-manufacturers-story\/\" \/>\r\n<meta property=\"og:locale\" content=\"fr_CA\" \/>\r\n<meta property=\"og:type\" content=\"article\" \/>\r\n<meta property=\"og:title\" content=\"From 12 Hours of Weekly Downtime to Near-Zero: A Food Manufacturer&#039;s Story - Ahearn &amp; Soper | proVision WMS\" \/>\r\n<meta property=\"og:description\" content=\"How ProVision Label and ProVision Automation by Ahearn &amp; Soper Inc. Transformed Production Efficiency The Challenge: A Production Line Brought to Its Knees For a mid-sized food manufacturing facility in...\" \/>\r\n<meta property=\"og:url\" content=\"https:\/\/www.ahearn.com\/fr\/from-12-hours-of-weekly-downtime-to-near-zero-a-food-manufacturers-story\/\" \/>\r\n<meta property=\"og:site_name\" content=\"Ahearn &amp; Soper | proVision WMS\" \/>\r\n<meta property=\"article:published_time\" content=\"2026-01-12T23:52:06+00:00\" \/>\r\n<meta property=\"article:modified_time\" content=\"2026-01-12T23:52:28+00:00\" \/>\r\n<meta property=\"og:image\" content=\"https:\/\/www.ahearn.com\/wp-content\/uploads\/2026\/01\/comtainer.jpg\" \/>\r\n\t<meta property=\"og:image:width\" content=\"2000\" \/>\r\n\t<meta property=\"og:image:height\" content=\"1145\" \/>\r\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\r\n<meta name=\"author\" content=\"Don Marino\" \/>\r\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\r\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"Don Marino\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimation du temps de lecture\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minutes\" \/>\r\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.ahearn.com\/from-12-hours-of-weekly-downtime-to-near-zero-a-food-manufacturers-story\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.ahearn.com\/from-12-hours-of-weekly-downtime-to-near-zero-a-food-manufacturers-story\/\"},\"author\":{\"name\":\"Don Marino\",\"@id\":\"https:\/\/www.ahearn.com\/#\/schema\/person\/d387904d13e177b6f7f79ea607ca4bef\"},\"headline\":\"From 12 Hours of Weekly Downtime to Near-Zero: A Food Manufacturer&#8217;s Story\",\"datePublished\":\"2026-01-12T23:52:06+00:00\",\"dateModified\":\"2026-01-12T23:52:28+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.ahearn.com\/from-12-hours-of-weekly-downtime-to-near-zero-a-food-manufacturers-story\/\"},\"wordCount\":1812,\"image\":{\"@id\":\"https:\/\/www.ahearn.com\/from-12-hours-of-weekly-downtime-to-near-zero-a-food-manufacturers-story\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.ahearn.com\/wp-content\/uploads\/2026\/01\/comtainer.jpg\",\"articleSection\":[\"Labeling\"],\"inLanguage\":\"fr-CA\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.ahearn.com\/from-12-hours-of-weekly-downtime-to-near-zero-a-food-manufacturers-story\/\",\"url\":\"https:\/\/www.ahearn.com\/from-12-hours-of-weekly-downtime-to-near-zero-a-food-manufacturers-story\/\",\"name\":\"From 12 Hours of Weekly Downtime to Near-Zero: A Food Manufacturer's Story - Ahearn &amp; Soper | proVision WMS\",\"isPartOf\":{\"@id\":\"https:\/\/www.ahearn.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.ahearn.com\/from-12-hours-of-weekly-downtime-to-near-zero-a-food-manufacturers-story\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.ahearn.com\/from-12-hours-of-weekly-downtime-to-near-zero-a-food-manufacturers-story\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.ahearn.com\/wp-content\/uploads\/2026\/01\/comtainer.jpg\",\"datePublished\":\"2026-01-12T23:52:06+00:00\",\"dateModified\":\"2026-01-12T23:52:28+00:00\",\"author\":{\"@id\":\"https:\/\/www.ahearn.com\/#\/schema\/person\/d387904d13e177b6f7f79ea607ca4bef\"},\"breadcrumb\":{\"@id\":\"https:\/\/www.ahearn.com\/from-12-hours-of-weekly-downtime-to-near-zero-a-food-manufacturers-story\/#breadcrumb\"},\"inLanguage\":\"fr-CA\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.ahearn.com\/from-12-hours-of-weekly-downtime-to-near-zero-a-food-manufacturers-story\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-CA\",\"@id\":\"https:\/\/www.ahearn.com\/from-12-hours-of-weekly-downtime-to-near-zero-a-food-manufacturers-story\/#primaryimage\",\"url\":\"https:\/\/www.ahearn.com\/wp-content\/uploads\/2026\/01\/comtainer.jpg\",\"contentUrl\":\"https:\/\/www.ahearn.com\/wp-content\/uploads\/2026\/01\/comtainer.jpg\",\"width\":2000,\"height\":1145},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.ahearn.com\/from-12-hours-of-weekly-downtime-to-near-zero-a-food-manufacturers-story\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.ahearn.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"From 12 Hours of Weekly Downtime to Near-Zero: A Food Manufacturer&#8217;s Story\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.ahearn.com\/#website\",\"url\":\"https:\/\/www.ahearn.com\/\",\"name\":\"Ahearn &amp; Soper | proVision WMS\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.ahearn.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-CA\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.ahearn.com\/#\/schema\/person\/d387904d13e177b6f7f79ea607ca4bef\",\"name\":\"Don Marino\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-CA\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/fe63dfdec13e8f4a1231d00709155f0a811c399e21751a6ffbb7a7178bb88408?s=96&d=mm&r=g\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/fe63dfdec13e8f4a1231d00709155f0a811c399e21751a6ffbb7a7178bb88408?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/fe63dfdec13e8f4a1231d00709155f0a811c399e21751a6ffbb7a7178bb88408?s=96&d=mm&r=g\",\"caption\":\"Don Marino\"}}]}<\/script>\r\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"From 12 Hours of Weekly Downtime to Near-Zero: A Food Manufacturer's Story - Ahearn &amp; Soper | proVision WMS","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.ahearn.com\/fr\/from-12-hours-of-weekly-downtime-to-near-zero-a-food-manufacturers-story\/","og_locale":"fr_CA","og_type":"article","og_title":"From 12 Hours of Weekly Downtime to Near-Zero: A Food Manufacturer's Story - Ahearn &amp; Soper | proVision WMS","og_description":"How ProVision Label and ProVision Automation by Ahearn &amp; Soper Inc. Transformed Production Efficiency The Challenge: A Production Line Brought to Its Knees For a mid-sized food manufacturing facility in...","og_url":"https:\/\/www.ahearn.com\/fr\/from-12-hours-of-weekly-downtime-to-near-zero-a-food-manufacturers-story\/","og_site_name":"Ahearn &amp; Soper | proVision WMS","article_published_time":"2026-01-12T23:52:06+00:00","article_modified_time":"2026-01-12T23:52:28+00:00","og_image":[{"width":2000,"height":1145,"url":"https:\/\/www.ahearn.com\/wp-content\/uploads\/2026\/01\/comtainer.jpg","type":"image\/jpeg"}],"author":"Don Marino","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"Don Marino","Estimation du temps de lecture":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.ahearn.com\/from-12-hours-of-weekly-downtime-to-near-zero-a-food-manufacturers-story\/#article","isPartOf":{"@id":"https:\/\/www.ahearn.com\/from-12-hours-of-weekly-downtime-to-near-zero-a-food-manufacturers-story\/"},"author":{"name":"Don Marino","@id":"https:\/\/www.ahearn.com\/#\/schema\/person\/d387904d13e177b6f7f79ea607ca4bef"},"headline":"From 12 Hours of Weekly Downtime to Near-Zero: A Food Manufacturer&#8217;s Story","datePublished":"2026-01-12T23:52:06+00:00","dateModified":"2026-01-12T23:52:28+00:00","mainEntityOfPage":{"@id":"https:\/\/www.ahearn.com\/from-12-hours-of-weekly-downtime-to-near-zero-a-food-manufacturers-story\/"},"wordCount":1812,"image":{"@id":"https:\/\/www.ahearn.com\/from-12-hours-of-weekly-downtime-to-near-zero-a-food-manufacturers-story\/#primaryimage"},"thumbnailUrl":"https:\/\/www.ahearn.com\/wp-content\/uploads\/2026\/01\/comtainer.jpg","articleSection":["Labeling"],"inLanguage":"fr-CA"},{"@type":"WebPage","@id":"https:\/\/www.ahearn.com\/from-12-hours-of-weekly-downtime-to-near-zero-a-food-manufacturers-story\/","url":"https:\/\/www.ahearn.com\/from-12-hours-of-weekly-downtime-to-near-zero-a-food-manufacturers-story\/","name":"From 12 Hours of Weekly Downtime to Near-Zero: A Food Manufacturer's Story - Ahearn &amp; Soper | proVision WMS","isPartOf":{"@id":"https:\/\/www.ahearn.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.ahearn.com\/from-12-hours-of-weekly-downtime-to-near-zero-a-food-manufacturers-story\/#primaryimage"},"image":{"@id":"https:\/\/www.ahearn.com\/from-12-hours-of-weekly-downtime-to-near-zero-a-food-manufacturers-story\/#primaryimage"},"thumbnailUrl":"https:\/\/www.ahearn.com\/wp-content\/uploads\/2026\/01\/comtainer.jpg","datePublished":"2026-01-12T23:52:06+00:00","dateModified":"2026-01-12T23:52:28+00:00","author":{"@id":"https:\/\/www.ahearn.com\/#\/schema\/person\/d387904d13e177b6f7f79ea607ca4bef"},"breadcrumb":{"@id":"https:\/\/www.ahearn.com\/from-12-hours-of-weekly-downtime-to-near-zero-a-food-manufacturers-story\/#breadcrumb"},"inLanguage":"fr-CA","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.ahearn.com\/from-12-hours-of-weekly-downtime-to-near-zero-a-food-manufacturers-story\/"]}]},{"@type":"ImageObject","inLanguage":"fr-CA","@id":"https:\/\/www.ahearn.com\/from-12-hours-of-weekly-downtime-to-near-zero-a-food-manufacturers-story\/#primaryimage","url":"https:\/\/www.ahearn.com\/wp-content\/uploads\/2026\/01\/comtainer.jpg","contentUrl":"https:\/\/www.ahearn.com\/wp-content\/uploads\/2026\/01\/comtainer.jpg","width":2000,"height":1145},{"@type":"BreadcrumbList","@id":"https:\/\/www.ahearn.com\/from-12-hours-of-weekly-downtime-to-near-zero-a-food-manufacturers-story\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.ahearn.com\/"},{"@type":"ListItem","position":2,"name":"From 12 Hours of Weekly Downtime to Near-Zero: A Food Manufacturer&#8217;s Story"}]},{"@type":"WebSite","@id":"https:\/\/www.ahearn.com\/#website","url":"https:\/\/www.ahearn.com\/","name":"Ahearn &amp; Soper | proVision WMS","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.ahearn.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-CA"},{"@type":"Person","@id":"https:\/\/www.ahearn.com\/#\/schema\/person\/d387904d13e177b6f7f79ea607ca4bef","name":"Don Marino","image":{"@type":"ImageObject","inLanguage":"fr-CA","@id":"https:\/\/secure.gravatar.com\/avatar\/fe63dfdec13e8f4a1231d00709155f0a811c399e21751a6ffbb7a7178bb88408?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/fe63dfdec13e8f4a1231d00709155f0a811c399e21751a6ffbb7a7178bb88408?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/fe63dfdec13e8f4a1231d00709155f0a811c399e21751a6ffbb7a7178bb88408?s=96&d=mm&r=g","caption":"Don Marino"}}]}},"_links":{"self":[{"href":"https:\/\/www.ahearn.com\/fr\/wp-json\/wp\/v2\/posts\/13058","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ahearn.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ahearn.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ahearn.com\/fr\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ahearn.com\/fr\/wp-json\/wp\/v2\/comments?post=13058"}],"version-history":[{"count":1,"href":"https:\/\/www.ahearn.com\/fr\/wp-json\/wp\/v2\/posts\/13058\/revisions"}],"predecessor-version":[{"id":13059,"href":"https:\/\/www.ahearn.com\/fr\/wp-json\/wp\/v2\/posts\/13058\/revisions\/13059"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ahearn.com\/fr\/wp-json\/wp\/v2\/media\/13060"}],"wp:attachment":[{"href":"https:\/\/www.ahearn.com\/fr\/wp-json\/wp\/v2\/media?parent=13058"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ahearn.com\/fr\/wp-json\/wp\/v2\/categories?post=13058"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ahearn.com\/fr\/wp-json\/wp\/v2\/tags?post=13058"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}